Sandy Fleming and Glen Palmer at the Quality Wind Project at Tumbler Ridge BC – Capital Power – 089

David Dodge Leave a Comment

This blade will be attached to a turbine at the Quality Wind project and is 49 meters long.

This blade will be attached to a turbine at the Quality Wind project and is 49 meters long.